Chemical Quality Control Building + Laboratory

PROJECT NAME:

Chemical Quality Control Building + Laboratory


LOCATION:

Rocky Mount, NC


PROJECT(S) DATA:

- 65,000 SQ. FT.

- $38MM

- Quality Laboratory

- Shared Plant Utilities

- Laboratory Utilities


SERVICES PROVIDED:

- Fast-Track

- Design-Build

- Detailed Design

- Project Execution Plan

- Project Schedule

- Resource Planning Cost Estimate

- Mechanical, Electrical, Process + Process Control Design


PARTNERS:

RGD, Integrated Design Architects, Stewart Engineering

Center of Excellence for Chemical Quality

Our client required a new 65,000 square foot Center of Excellence for Chemical Quality (CQ) facility. To meet their aggressive schedule, the HIPP team partnered with RGD to deliver the CQ building as a fast-track design-build in under a year.


The QC building was designed to accommodate a headcount of 150+ Regulatory and Quality Engineering personnel and includes additional space to move production support personnel out of the controlled, non-classified (CNC) manufacturing area.


The Laboratory features the latest technology and advancements in quality and analytical testing and inspection evaluating more than 450 different products. With improved workflow designed for efficiency and segregation of activities including lab analyst and data input space, our client can now support increased material testing and meet future regulatory requirements. This includes adequate space and design for Materials and Controlled Drug storage.