Client: BIOGEN IDEC - Research Triangle Park, NC 

Project: Stability Control and Sterility Test Laboratories

Scope: Design new stability control lab with seven new stability chambers to meet increasing testing demands. Renovate existing stability chamber equipment room to create sterility testing room with airlock.

  • Custom Walk-in Stability Chambers 2-8º C
  • Reach-in Stability Chamber (20-25ºC)
  • Level 2 Bio-safety Hood
  • Class 10,000 Clean Room
  • Pressurization Monitoring and Alarm System

Client: SYNGENTA BIOTECHNOLOGIES - Research Triangle Park, NC

Project: Lab Renovations

Estimated Construction Cost: $2.8 MM

Scope: Renovate two existing laboratories to provide improved work areas to support Regulatory Science and Transformation departments.

  • Conversion of existing Constant Volume System to Variable Air Volume
  • Lab Piping System Expansion for Natural Gas, Vacuum, Compressed Air, and DI Water
  • Utilities for Specialty Lab Equipment, including Environmental Chambers and Incubators
  • Relocation and Tie-in of Laminar Flow and Chemical Fume Hoods
  • Design of new Chiller and Emergency Stand-by Generator

Client: SYNTHON PHARMACEUTICALS - Research Triangle Park, NC 

Project: Laboratory Upfit

Estimated Construction Cost: $2.6 MM

Scope: Reconfigure three existing lab spaces to provide new space for microbiology, stability control, and quality control. 

  • 100% Outside Air
  • Perchloric Acid Hood
  • Waste Neutralization System
  • High Purity Water and Specialty Lab Gas Systems
  • Bench Local Exhaust
  • Utility Systems Expansion
  • LEMS Control System and BAS System Expansion
  • HPLC Integration
Photo-SYN-25
Photo-0088
Photo-SYN-26

 